Video

Apartment for sale in Cannes

6 700 000
252 m²
5 main rooms
REF :
V6584CA
6 700 000

Brand new luxury residence Stunning Penthouse

In the highly sought-after Californie area, very close to the city centre, this superb four bedroom apartment of about 250 sqm is situated in a prestigious estate.
The Domaine Californie includes 3 buildings, the villa Araucaria, superb mansion erected in 1925 which was previously part of the Château de Thorenc, entirely refurbished and two additional buildings.
The whole, achieved in a contemporary style, enjoys an exceptional quiet environment with a magnificent landscaped park.
This apartment is composed of : a vast entrance hall, a living-dining room of 70 sqm, a kitchen with adjacent storeroom, a laundry, one master suite, three further en suite bedrooms, guest toilet and a wide terrace.
A mesmerizing 200 sqm rooftop terrace is fitted with a summer kitchen and a private pool.
This flat has three parking spaces.
The estate offers as well a wonderful swimming pool area and a pool house, a Fitness room, caretaker services and remote monitoring.

Ask for more information through your contact person

Consult our privacy policy.
Agency logo
JOHN TAYLOR CANNES
6 RUE FRÉDÉRIC AMOURETTI
06400 - Cannes

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Fees paid by the seller
  • Property in a condominium
  • Number of lots : 84
  • Average yearly fees : 14 000,00 €
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Main rooms : 4

Main rooms : 4

Air conditioner

Air conditioner

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

102 |4
4
Dpe completed after July 20, 2021