Video

House for sale in Saint-Pierre-d'Oléron

966 000
216 m²
9 main rooms
REF :
VP10-109
966 000

La Cotinière - “Belle Époque” Villa

Royan Ile d'Oléron Sotheby's International Realty offers you in the heart of the emblematic village of La Cotinière, this perfectly maintained 1900 villa.
Within walking distance of shops, beaches and the port, this exposed stone house has retained its early 20th century charm while offering comfortable services. The main accommodation offers living on one level thanks to three bedrooms on the ground floor, all equipped with their private bathroom. The through living room is decorated with a fireplace and the perfectly equipped kitchen opens onto an intimate terrace and adjoins a storeroom. Upstairs, a large mezzanine serves a master suite consisting of a bedroom, a dressing room and a bathroom. An independent studio and one-bedroom apartment allow you to receive family and friends or continue the gîte/bed and breakfast activity. A veranda, a two-wheel shelter and five parking spaces complete this rare property in the heart of the emblematic resort. See the phone number

Ask for more information through your contact person

Consult our privacy policy.

Royan Île d'Oléron Sotheby's International Realty
11 rue de la République
17310 - Saint-Pierre-d'Oléron

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Price fees included : 966 000 €
  • Price fees excluded : 920 000 €
  • 5,00 % of fees, VAT included, paid by the buyer
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

194 |6
6
Dpe completed after July 20, 2021