Video

Apartment for sale in Paris 20Ème

1 750 000
240 m²
5 main rooms
REF :
getkey_u_448186964
1 750 000

Pyrénées - Père Lachaise

Located in the heart of the Village Saint-Blaise, close to transport and all shops, sublime Loft crossing with large glass roof, with a surface of 236,28 m2 law Carrez.
On the first floor of a XXth century building, the Loft is composed as follows : An entrance, as well as a spacious living room of a hundred m2, an open kitchen equipped and fitted, a master suite with a shower room, dressing room and separate toilet, an office space, a second living room with mezzanine, a second bedroom with adjoining bathroom, a laundry room and two additional toilets.
This spacious loft impresses by its volume and its brightness. Its layout combines modern high-end office space with the industrial characteristics retained by the structure. The modern layout preserves the spirit of the site and highlights the structural materials of the industrial building. In an old building, it offers a preserved living environment of absolute calm. See the phone number

Ask for more information through your contact person

Consult our privacy policy.
Agency logo
Agences de France
38 RUE JIM SEVELLEC
29280 - Brest
See the phone number

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Price fees included : 1 750 000 €
  • Price fees excluded : 1 715 686 €
  • 2,00 % of fees, VAT included, paid by the buyer
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Intercom

Intercom

Main rooms : 4

Main rooms : 4

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

255 |21
21
Dpe completed after July 20, 2021