Video

House for sale in Sanary-sur-Mer

6 750 000
400 m²
8 main rooms
REF :
85114367
6 750 000

Sanary - Exceptional property - Waterfront

Situated just a stone's throw from the Port of Sanary and Portissol beach, in a dominant position and in first rank benefiting from private and secure access to the sea, exceptional property built on three levels offering panoramic views.
The property comprises :
On the main level: a vast reception area of over 140 m² with entrance hall, living/dining room, open-plan kitchen, TV lounge, storeroom and terraces.
On the upper floor: a large parental space, two dressing rooms, a gym, terrace and jacuzzi overlooking the bay.
Garden level: two suites, a large children's area, an office and a dormitory.
A 15-meter-long swimming pool and a beautiful pool house complete the ensemble.
Garage and four indoor parking spaces.
Permission accepted for the construction of an elevator.
The geographical location just a few minutes' walk from the center and the beach, the panoramic sea view, the privileged access to the sea, and the quality of the fittings give this property an exceptional character. Agency fees payable by vendor See the phone number

Ask for more information through your contact person

Consult our privacy policy.
Agency logo
Barnes Littoral Varois
Place Michel Pacha
83110 - Sanary-sur-Mer

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Fees paid by the seller
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Main rooms : 4

Main rooms : 4

Air conditioner

Air conditioner

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

23
Dpe completed after July 20, 2021