Video

Apartment for sale in Levallois-Perret

1 160 000
100 m²
4 main rooms
REF :
PO1-1969
1 160 000

Apartment in Levallois Perret

Luxury Apartment Designed by Interior Architect
Discover this elegant 97 sqm (1,044 sqf) apartment, located on the first floor of a historic 19th-century building with an elevator, beautifully restored with taste and refinement. Every detail has been carefully considered by an interior architect, creating an exceptional and unique living environment.
The apartment opens onto a spacious entrance leading to a bright living-dining room with an open-plan kitchen, facing southeast to enjoy natural light throughout the day. The contemporary-styled living room, designed with high-end materials, serves as a perfect reception space.
The master suite features a custom-made walk-in closet and a private shower room. Two comfortable children's bedrooms and a second shower room complete the optimized layout, ideal for family living.
The property boasts impeccable quality, with refined finishes and modern amenities. The apartment is sold fully furnished with premium designer furniture.
A cellar adds to this rare offering, perfect for those seeking a turnkey home.

Ask for more information through your contact person

Consult our privacy policy.
Agency logo
PARIS OUEST SOTHEBY'S IR VICTOR HUGO
138 Avenue Victor Hugo
75016 - Paris 16ème

Photos of the property


Further details
Download the ad's brochure in PDF format

Further details

Further details

INFORMATION

  • Fees paid by the seller
  • Average yearly fees : 3 696,00 €
  • No legal proceedings underway

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

307 |10
10
Dpe completed after July 20, 2021