Brand new home of 107. 30sqm built interior plus 18. 10sqm of terrace on the ground floor, with 3 bedrooms and 2 bathrooms on Poblenou.
Cornex Capital exclusively presents this development project for a new construction residential development that includes 15 homes plus a ground floor premises in the center of Barcelona, in the Poblenou neighborhood.
The development is located on Juan de Austria street. The project has a privileged location, in the heart of the Poblenou neighborhood, a consolidated residential and office area that has all types of services and direct communication with the historic center of Barcelona. The development is located 20 minutes walk from the main tourist attractions of the city, including the Sagrada Familia, the Ciudadela Park or the Plaza de Catalunya, and 20 minutes from the beach, the Paseo Marítimo and the Olympic Port.
El Poblenou is a neighborhood located in the San Martín district, in the center of the city of Barcelona. In particular, the development is located in the El Parc i la Llacuna del Poblenou neighborhood, which has a population of more than 14,000 inhabitants. The neighborhood has excellent metro and bus connections with the historic center of the city, as well as direct access to the 22@ District.
The promotion sells apartments with 3 bedrooms and 2 bathrooms, all of them with access to balconies and/or terraces of between 10 and 20m2. In addition, it includes an excellent penthouse with access to a large 60m2 terrace for private use.
All flats enjoy a modern and functional design, with large, open spaces, as well as large windows that allow in abundant natural light. Likewise, in its outdoor spaces, you can relax after a long day and take advantage of the mild temperature of Barcelona.
As for its facilities, it has ducted air conditioning with a heat pump and an aerothermal system for the production of domestic hot water. The kitchens come fully furnished with high and low furniture and Silestone countertops, and equipped with built-in appliances (hob, oven and hood). The bathrooms include the best Roca brand equipment.
Start of work: May 2024 with foundation done.
Work forecast 12-15 months.
End of work forecast: last quarter 2025.
Expected delivery: last quarter 2025 - first quarter 2026.
Legal references
Characteristics
Energy and Risks