Mountain Residence Alto da Montanha T2 5th floor 143m2
Development with contemporary architecture, in a recent, rapidly growing residential area, belonging to the municipality of Oeiras, located in the new Alto da Montanha Urbanization in Carnaxide, but which proposes a new vision of the city, environmentally sustainable and with spaces that alternate privacy and life community.
It establishes a new standard of quality, space and design in the residential offer in Oeiras.
Here you can enjoy a rooftop with a stunning view over the Tagus River.
It consists of magnificent apartments, T1, T2, T3 and T4 with high quality materials and equipment, with terraces and balconies, with 2 units per floor, facing East / South, with panoramic views over the Tagus River.
There is an approved urbanization plan for Serra de Carnaxide that includes a water park, leisure areas, equestrian center, hotel, campsite: Serra de Carnaxide Suburban Park Urbanization Plan.
It is located 2 km from Shopping Alegro de Alfragide and the entire surrounding shopping area and 10 km from Shopping Oeiras Park and 9 km from Colombo Shopping Center.
It has good road access and a variety of directions to use, being 5 km from the IC19 (Sintra-Lisbon), 11 km from the CREL motorway (Caxias-Alverca) and 3 km from the A5 (Lisbon-Cascais). Access to various public transport. The center of Lisbon is 11 km away, Lisbon airport is 15 km away; the center of the village of Sintra is 21 km away and the center of Cascais is 23 km away. In this location you are 9km from several beaches along the Cascais line.
It consists of 13 apartments of types T1, T2, T3 and T4 spread over 7 floors, with T1 on floor 0, and on floors -1 and -2, we have parking spaces and storage rooms.
- Terraces
-Balconies
- Photovoltaic solar panels
- Double-glazed windows with aluminum frames with system
to run
- Electric blinds
- Air conditioning in all rooms
- Kitchen equipped with built-in furniture
- Built-in wardrobe in the Hall
- Built-in wardrobes in bedrooms
- Installation for electric cars
- Parking spaces for 2 cars
- Collection
Construction expected to end in the third quarter of 2024.
During construction, the project may, for technical or commercial reasons, undergo price changes.
Energy Rating: Exempt
Legal references
Characteristics
Energy and Risks