House for sale in Voúla - GREECE

1 550 000
157 m²
4 main rooms
REF :
012362
1 550 000

3 bedroom luxury Townhouse for sale in Voúla, Attica

Exquisite Luxury Living in Voula: Energy-Efficient A++ Townhouse, Athens Riviera
Welcome to this Ground Floor Maisonette, an exceptional luxury residence in Voula, designed for those who appreciate elegance, modern comfort, and sustainable living. This expansive 156.54 sqm home spans two levels, with 86.27 sqm on the ground floor and 70.27 sqm on the first floor, offering a harmonious blend of space and style.
Step into your private 135 sqm yard, where a stunning 38 sqm swimming pool invites you to relax in serenity.
This property boasts a variety of premium features, including:
- Three spacious bedrooms and three luxurious bathrooms designed for ultimate comfort
- A double-height open plan office space, perfect for work-from-home or creative pursuits
- A bioethanol fireplace, combining modern design with eco-friendly warmth
- Advanced climate control, featuring underfloor heating, heat pump technology, and a VRV cooling system for year-round comfort
- Two private parking slots and a storage room for added convenience
This residence is an architectural masterpiece, emphasizing energy efficiency with an A++ rating, blending luxurious living with environmental consciousness.
Indulge in the ultimate Voula lifestyle in this exclusive townhouse, designed for those who demand the best.

Ask for more information through your contact person

Consult our privacy policy.

Marlo Property Greece

- Athens

Photos of the property


Further details

Further details

Legal references

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Characteristics

Information on the risks to which this property is exposed is available on the Géorisques website : <a href="https://www.georisques.gouv.fr">www.georisques.gouv.fr</a>: www.georisques.gouv.fr

Energy and Risks

1
Dpe completed after July 20, 2021