Fabulous T3 with balcony of 28.5m2 in Matosinhos.
This apartment has an open space equipped kitchen, a bathroom to support the social area, a suite with closet, two bedrooms with built-in wardrobes, a full bathroom to support the bedrooms and a balcony with access through all rooms.
This apartment also benefits from a parking space and storage.
A new development is born in Matosinhos composed of two blocks, one of multifamily housing and the other of serviced apartments.
With a unique location, close to the main roads, less than 1km from Norteshopping, hospitals, schools, services and public transport including metro.
The apartments are delivered with siemens brand equipped kitchens, pre installation of air conditioning, high security door, Sanindusa toilets, photovoltaic panels, natural air filters, among other contemporary and innovative details.
The first block will consist of 28 apartments of typologies T1, T2, T3 and 3 shops, which will give life to a multifamily building, of great aesthetic beauty, dominated by the green of the plants on the facades and rooftop and the beautiful flower beds on all balconies. With areas between 105 and 250 m2, these magnificent apartments benefit from balconies/ terraces, storage and parking spaces.
The second block consists of 50 Serviced Apartaments, which enjoy a range of reference services including House Keeping simple cleaning daily, kitchen and baths, garbage collection; House Keeping weekly general cleaning with change of clothes; Light, water and internet, bed and bath linen, shower and hand gel, dishwashing detergents and laundry.
With parking option in garage, Breakfast option and Room service option. All fractions have direct support and association with a chain of Gourmet Restaurants and grocery stores of a renowned group in the city, which includes among other services access to pre-cooked meals, Bakery and Pastry, Chocolataria, Confectionery and Ice Cream, Garrafeira and Florist.
With a guaranteed yield of 5% in the first 2 years and growth forecast in the following years, it is expected to double the amount invested at the end of 8 years.
Completion of the work scheduled for November 2024.
Energy Rating: A
Legal references
Characteristics
Energy and Risks